Sponsors and CROs choosing a randomization and trial supply management (RTSM, also called IRT) system for interventional trials.
Scope Sponsors and CROs choosing an RTSM/IRT system to randomize participants and manage investigational product supply in interventional trials. Site-side pharmacy tools and stand-alone supply planning software are out of scope.
These notes describe the products in the RTSM / IRT guide.
Prancer RTSM
Best for
Sponsors and CROs with complex dosing or adaptive designs who want an RTSM specialist with supply forecasting
What to consider
4G Clinical is an RTSM specialist: Prancer covers randomization, resupply and direct-to-patient shipping, and 4C Supply adds portfolio-level forecasting. It publishes a SOC 2 Type 2 report and a Part 11 statement, and says it has supported more than 1,000 studies. It has no EDC or eCOA of its own, so plan for integrations.
Oncology, CNS and rare disease sponsors who want IRT alongside eCOA, eConsent and patient payments on one platform
What to consider
Suvoda runs its RTSM on one platform with eCOA, eConsent and Greenphire patient payments, and offers pre-built API integrations with major EDCs. It publishes the shortest build claim on this list (kickoff to UAT in as little as two weeks, footnoted as preliminary testing) and an annual SOC 2 Type 2 audit for RTSM. Its public pages name stratification and adaptive designs but not minimization.
Single and double checks describe documented support for an individual feature. Double checks use the extended definition for that feature. Unknown means the available evidence does not establish support.
Expand a feature definition or support note for context and its original source.
Prancer RTSM vs Suvoda RTSM (RTSM / IRT): category feature evidence and sources. Products are not ranked.
Category feature
Prancer RTSM
Suvoda RTSM
Randomization and blindingFeature definitions
Supported
Randomization or blinding workflows are stated.
Extended support
Named allocation methods include minimization or dynamic allocation.
Prancer RTSM
Extended support
4G names stratification, cohort-specific logic, variable blocks and minimization, with versioned logic that protects blinding and handles re-randomization.
Named methods include variable blocks and minimization with blinding protection.
Suvoda RTSM
Supported
Suvoda lists adaptive randomization, stratification, cohort and dose management and blinding management, but its public pages do not name minimization or dynamic allocation.
Adaptive and stratified randomization are stated; minimization or dynamic allocation is not named.
Trial supply managementFeature definitions
Supported
Drug inventory, dispensing, shipping or resupply workflows are documented.
Extended support
Supply forecasting and direct-to-patient delivery (shipping or dispensing) are both documented.
Prancer RTSM
Extended support
Prancer handles dispensing and resupply with buffer-to-predictive forecasting and 4C Supply scenario modeling; direct-to-patient shipping was added in April 2020 (4G blog).
Predictive resupply, scenario modeling and direct-to-patient shipping are stated.
Suvoda RTSM
Extended support
The RTSM page lists drug supply forecasting, direct-to-patient shipping, temperature excursion management, and accountability, returns and destruction.
Drug forecasting and direct-to-patient shipping are both named.
Study build speed and mid-study changesFeature definitions
Supported
Study setup or post-go-live study changes are described.
Extended support
Study setup is described, and post-go-live changes explicitly avoid interrupting live study use.
Prancer RTSM
Supported
4G says its NLP-based build takes under four weeks, with specification sign-off to go-live in as little as 13 calendar days, and changes made without impacting study progress.
A build timeline and changes protecting study progress are stated; uninterrupted live use is not explicit.
Suvoda RTSM
Supported
Suvoda states kickoff to UAT in as little as two weeks (footnoted as preliminary testing), and permissioned users can make common post-go-live changes without a change order.
The UAT timeline concerns preliminary testing; permissioned changes do not establish uninterrupted live use.
Integrations and platformFeature definitions
Supported
Integration or data exchange with another system or application is described.
Extended support
Integration with a clinical-trial application plus an API for integration are both stated.
Prancer RTSM
Supported
4G documents connections to EDC, CTMS, depot and logistics systems and data warehouses, but has no EDC or eCOA of its own and we found no public API reference.
Trial standards and a dated SOC report period are stated; public report access is not established.
Suvoda RTSM
Supported
Suvoda says its RTSM adheres to 21 CFR Part 11 and that it maintains SOC 2 Type 2 compliance; its certifications page confirms an annual SOC 2 Type 2 audit for RTSM.